Edition No. 1
Localised heating required primarily in the packing and returns area,
A Fabbri F85 was installed and flued through the roof of the 5000 square foot building. The heat blowers were adjusted to point at the packing station and the returns area, raising the temperature by an extra 10 degrees centigrade compared to the rest of the warehouse.
The staff use broken pallets and other clean wood waste to fuel the heater and the accounts department enjoy the new “secure document destruction” facility, as they are able to burn sensitive documents whenever the warehouse heater is lit.